Azure · Microsoft Azure / Foundry · LLM Llama-4-Maverick-17B-128E-Instruct-FP8 Shutdown scheduled Shuts down on Nov 19, 2026 27 days left
Azure will shut down Llama-4-Maverick-17B-128E-Instruct-FP8 on Nov 19, 2026 (27 days from now). No replacement has been published. Source: learn.microsoft.com · Last checked Oct 23, 2026
Notice Shutdown scheduled 27 days left
Shuts down on Nov 19, 2026 Azure lists 2026-11-19 as the shutdown date. Listed model identifier.
Hosting route Microsoft Azure / Foundry
Affected scope Listed model identifier
Replacement None published
Announced Not published
First seen by ModelClock Oct 22, 2026 | Llama-4-Maverick-17B-128E-Instruct-FP8 | — | GA | 2026-11-19 | — |
Read from the provider's table: each value comes from its row, with the row's scope kept.
Loading revision history…Raw history JSON Add a badge to your README Shows this model's current status and follows new notices from the provider. Unknown models show “not tracked”, so a README never breaks.
Markdown Copy
[](https://model-clock.com/models/azure/Llama-4-Maverick-17B-128E-Instruct-FP8)HTML Copy
<a href="https://model-clock.com/models/azure/Llama-4-Maverick-17B-128E-Instruct-FP8"><img src="https://model-clock.com/badge/azure/Llama-4-Maverick-17B-128E-Instruct-FP8.svg" alt="Llama-4-Maverick-17B-128E-Instruct-FP8 shutdown date"></a>Prefer Shields.io styles? Use the endpoint badge with https://model-clock.com/badge/azure/Llama-4-Maverick-17B-128E-Instruct-FP8.json.